Port walls and quay structures face constant stress, erosion, and structural degradation. Many are over 50 years old, and regulations require regular inspection
From a live quay-wall mission to a measurable dataset
Real subdron AUV survey at the Scandlines Puttgarden ferry terminal. What the vehicle collects becomes a cm-accurate 3D point cloud with anomalies flagged automatically, ready for engineering review.
1–2 person crew, operational within minutes, no berth closure.
28 objects precisely located and measured, anomalies flagged automatically.
RON-OS turns any AUV or ROV into a quay-wall and sheet-pile survey system
Fully autonomous cm-level 3D scans of quay walls, piles, and lock gates.
Cracks, corrosion, deformation, and sheet pile misalignment, flagged automatically.
No operational disruption, no berth is closed during inspection.
Shift from reactive repair to predictive maintenance planning.
One autonomous workflow, end to end. 600 m scanned in a single shift, zero berth downtime.
Define survey scope, route, and sensor configuration for the asset.
Launch on site with a 1–2 person crew, operational within minutes.
RON follows the structure at zero visibility, no divers, no downtime.
Cloud reconstruction produces a cm-accurate 3D model with ML-flagged anomalies.
An interactive, shareable 3D dataset for the operator.
Export into asset management systems for year-over-year comparison.
Start with a baseline survey
Fully autonomous cm-level 3D inspection of quay walls, piles, and lock gates.